Laserfiche WebLink
-4- <br />12. Primary future (Post- minine) land use (check one): <br />© Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />13. Primary resent land use check one): <br />M Cropland(CR) `� Pastureland(PL) <br />F Rangeland(RL) Forestry(FR) <br />Residential(RS) F� Recreation(RC) <br />Developed Water Resources(WR) <br />JJ <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />€J industrial /Commercial(IC) <br />14. Method of Minine: Briefly explain mining method (e.g. truck/shovel): <br />Mining includes a front -end loader. Material is loaded into trucks and hauled to customers. <br />15. On Site Processing: —0 Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: <br />None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />Barton Pit M- 2000 -149 is a limited impact 110 pit. I am expanding the acreage to a <br />eenStFuetien FnateFial Fegu!aF (112) epeFatien. The aeFeage is being ineFeased a total of 66.1 <br />acres which encompassed the entire parcel under my ownership. I his action will give my <br />trucking firm a long term supply of material for my customer base. <br />