Laserfiche WebLink
} <br />J <br />This was a production shot. This shot was done to create material for processing. All product shot can be <br />inventoried. <br />Hole <br />No. <br />Shot <br />No. <br />Hole Depth <br />High Explosives <br />(Ibs <br />Blasting Agent (Ibs) <br />Stemming <br />Delay (ms) <br />1 <br />(3 5/8" <br />hole <br />1 <br />10 FT. AVG. <br />(5' 19') <br />1.0 <br />3.5 — 25 Lbs. on <br />3 5/8" holes <br />4 —12 Ft. <br />251350 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />31 <br />32 <br />(6" <br />hole) <br />33 FT <br />(14' <br />AVG. <br />50') <br />42 — 354 Lbs. <br />holes. <br />on 6" <br />10 -1 <br />FT. <br />25/35C <br />& 17ms <br />tie in. <br />in hole <br />row <br />thru <br />110 <br />75 <br />(Misfire) <br />2 <br />39 FT. <br />1.0 Lb. Booster <br />already existing: <br />Misfire due to <br />detonator cord <br />being cut. <br />0 Lbs. <br />(No Blasting Agent <br />Added) <br />16' <br />(No <br />Stemming <br />Added) <br />350 in hole <br />Note: Surface delay cutoff, or misfire as referenced in the above blast report, of hole #75 during <br />the initial "Main" blast occurred. The hole was found upon the post blast review and was <br />subsequently detonated to ensure the charge was cleared. <br />Seismograph was set -up north of Tezak office to monitor shot. Seismograph registered .005 in /s @ <br />100 HZ (particle blast) and .001 PSI @ 9.8 HZ (air blast) at 12:53pm on January 23, 2013. <br />