Laserfiche WebLink
Project: <br />M <br />"--------- - "--- - <br />13 • ' GEOTECH i <br />ure: D698 <br />Client / On Site Rep: <br />F <br />Cohesionless Soils <br />Abratory: <br />I X I <br />Bowie Resources / B. <br />Bear <br />Contractor /Rep: <br />ON THIS DATE FOR THE FOLLOWING REASONS: <br />Bowie Mine Gob Pile Stability <br />Civil, Structural & Geotechnical Engineers <br />ctor Not Working Due To: <br />The Contractor Is: <br />ent Weather: <br />Bowie Resources / Gary <br />Harding <br />lent Malfunction: <br />Stripping and /or Grubbing: <br />222 South Park Ave. • Montrose, co 81401 <br />Ph.: (970) 249 -8828 • FAX: (970) 249 -0945 <br />Mod <br />High <br />Project No: <br />Date: <br />Technician: <br />2005126 -CMT <br />5/20/2013 <br />CONSTRUCTION MATERIALS TESTING <br />Dry <br />G. Jones <br />Humid <br />umidity: <br />DAILY COMPACTION <br />REPORT <br />X <br />LOCATION <br />GRADE <br />TEST TYPE <br />MAX DRY <br />OPTIMUM <br />DRY <br />MOISTURE <br />PERCENT <br />NOT <br />SOIL <br />LAB SAMPLE <br />NUC <br />SAND <br />TEST <br />NUMBER <br />ELEV <br />DENSITY <br />MOISTURE <br />DENSITY <br />CONTENT <br />COMPACTION <br />WITHIN <br />TYPE <br />NUMBER <br />(pcf) <br />CONT. ( %) <br />(pcf) <br />( %) <br />SPEC <br />795 <br />Pt. 4963 (N: 19175.64 - E: 37277.08) <br />6052.4 <br />X <br />96.9 <br />11.4 <br />90.2 <br />11.5 <br />93.0 <br />417/418 r/c @15% <br />796 <br />Pt. 4964 (N: 19188.89 - E: 37217.08) <br />6053.5 <br />X <br />103.6 <br />10.4 <br />98.8 <br />12.1 <br />95.3 <br />354/355 r/c @19% <br />797 <br />Pt. 4965 (N: 19197.24 - E: 37169.74) <br />6053.9 <br />X <br />102.1 <br />10.71 <br />93.31 <br />16.41 <br />91.3 <br />354/355 r/c @15% <br />798 <br />Pt. 4966 (N: 19198.40 - E: 37109.92) <br />6053.7 <br />X <br />1 <br />101.7 <br />10.71 <br />92.91 <br />12.11 <br />91.3 <br />354/355 r/C @14% <br />MOISTURE / DENSITY SPECIFICATIONS <br />90% Cohesive Soils <br />Cohesionless Soils <br />N/A Cohesive Soils <br />Cohesionless Soils <br />OBSERVATION / TESTING <br />Full Time: <br />Part Time: <br />Number of Site Visits /Day: <br />Testing Only: IX <br />Requested By (Company Name): <br />tory Testing ASTM Cohesive soils <br />M <br />Bowie Resources <br />ure: D698 <br />Th <br />F <br />Cohesionless Soils <br />Abratory: <br />I X I <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />lof <br />Insufficient amount <br />ON THIS DATE FOR THE FOLLOWING REASONS: <br />70 -85 <br />material placed. <br />ctor Not Working Due To: <br />The Contractor Is: <br />ent Weather: <br />Processing Frozen Material: <br />Processing Wet Matenal, <br />lent Malfunction: <br />Stripping and /or Grubbing: <br />Moisture Conditioning Dry Mat'I: <br />Mod <br />High <br />Nn: <br />Stockpiling Fill: <br />Removing Unsuitable Mad: <br />Date <br />Day: <br />FIELD OBSERVATIONS <br />5/20/201 <br />S <br />M <br />T <br />W <br />Th <br />F <br />S <br />Abratory: <br />I X I <br />I <br />T032 <br />I <br />I I <br />70 -85 <br />'eather: <br />Sun <br />Clear <br />Overcast <br />Rain <br />Smooth Drum Roller, <br />Abratory: <br />X <br />X <br />T032 <br />32 -50 <br />50 -70 <br />70 -85 <br />85 Up <br />amp: <br />X <br />Still <br />Mod <br />High <br />Find: <br />X <br />Dry <br />Mod <br />Humid <br />umidity: <br />X <br />!formed (Rep of Company) of Test Results: <br />Ron Grimland (Bowie Resources) <br />Copies Given To: <br />Other: <br />05 -126 -CMT Bowie Mine No. 2 Gob Pile Stability 2012 +.xis DCR5- 20 -13gj #795 <br />:ompactlon Equipment Used: <br />:AT 815 <br />3heepsfoot: <br />i ^ I <br />Smooth Drum Roller, <br />Abratory: <br />3ther (List Below): = <br />Buckhorn was not informed prio <br />to our arrival on site that the <br />contractor would not be working <br />on this date. <br />PAGE 1 OF 1 <br />