My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-15_REVISION - X198316908 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
X198316908
>
2013-07-15_REVISION - X198316908 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:22:29 PM
Creation date
7/16/2013 1:00:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X198316908
IBM Index Class Name
REVISION
Doc Date
7/15/2013
Doc Name
Proposed Decision Letter & Cost Estimate
From
DRMS
To
Twentymile Coal Company
Type & Sequence
SL1
Email Name
ERR
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />Task description: Mobilization /Demobilization of Equipment <br />Site: Twentymile Fish Creek Permit Action: SL Permit/Job #: X198316908 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 7/15/2013 County: Routt <br />User: ERR <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Abbreviation: None <br />Filename: X 169 -002 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON- HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities <br />0 -25 Tons <br />26 -50 Tons <br />51+ Tons <br />Ownership Cost /Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cost/hr /unit <br />Size <br />Cost /hr/ <br />Cost/hr/ fleet <br />Cost/ fleet <br />(TONS) <br />fleet <br />SCHRAMM <br />1.25 <br />$64.50 <br />$88.67 <br />1 <br />$153.17 <br />$88.67 <br />$250.00 <br />T450BH <br />Subtotals: 1 $153.17 $88.67 $250.00 <br />ROADABLE EQUIPMENT: <br />Machine Description <br />Total Cost /hr/ unit <br />Fleet Size <br />Haul Trip <br />Cost/hr/ fleet <br />Return Trip <br />Cost /hr/ fleet <br />Water Tanker, 2,500 Gal. <br />$50.75 <br />1 <br />$50.75 <br />$50.75 <br />Subtotals: 1 $50.75 1 $50.75 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.