Laserfiche WebLink
INTEROFFICE MEMORANDUM <br />TO: COLOWYO FILE (PERMIT C- 1981 -019) <br />FROM: ROB ZUBER <br />SUBJECT: <br />COLOWYO MINE SL -07 BOND RELEASE, ADEQUACY FOLLOW -UP PHONE CONVERSATION <br />DATE: 07/12/2013 <br />In my adequacy review letter of 10 June 2013, I asked Colowyo Coal Company staff to revise the <br />application to remove areas that still had rock piles, a scraper road, and topsoil stockpiles. I also asked <br />them to clarify if a topsoil stockpile is within parcel WP019 (on the western side of the parcel). In a <br />response to my adequacy concerns (letter from Chris McCourt dated 25 June 2013), Colowyo addressed <br />most of my issues but did not address the issue with the topsoil stockpile on the western side of WP019. <br />To clarify this issue, I called Tony Tennyson of Colowyo on 12 July 2013. Tony reviewed his AutoCAD <br />files and determined that the topsoil stockpile in question is outside of the area in the SL -07 bond release <br />application. This is believable based on field reconnaissance and a review of maps by DRMS staff <br />(myself and Jason Musick). Therefore, I have determined that this issue has been addressed by Colowyo. <br />