2013-07-11_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-07-11_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:22:24 PM
Creation date
7/12/2013 8:46:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
7/11/2013
Doc Name
Weekly CQA Report: 6/15/13, 6/22/13, and 6/29/13.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Secondary Underdraln: <br />No work was performed on the <br />A total of 1380 feet of <br />Primary Underdrain: <br />No work was performed on the <br />A total of 1280 feet of Primary t <br />Temporary Underdrain: <br />An amec field representative of <br />temporary underdrain pipe was <br />Underdrain Ponds: <br />Concrete for the underdrain Poi <br />Tree /Slash Clearing, Chippir <br />Seed Masters paused operation <br />B) Underground Workings <br />Confirmatory drilling complete <br />spaced on 4( + / -) foot centers <br />During this reporting period no i <br />During this reporting period re <br />U6037, No. 06160, No. U61& <br />refusal into rock varying depths <br />in 2 foot loose lifts to approxin <br />and 'bucket tamped" with the <br />material, ice and snow and are <br />C) Highway 67 <br />Fill continues to be placed <br />western downstream slope of <br />II) Storm Water Management <br />Best Management Practices <br />ACTIVITIES: <br />I) Field Activities: Construction a <br />embankment fill placement and cor <br />are field tasks performed during this <br />II) Laboratory Activities: Laboi <br />Moisture- Density, gradations and <br />this reporting period as required. <br />?condary underd in during this reporting period. <br />1, <br />underdrain has been completed. <br />underdrain <br />has <br />the fusing <br />I thru the i <br />luring this reporting period. <br />completed. <br />placement of the temporary underdrain pipe on June 19d, The <br />nkment per plans during this reporting period. <br />are complete, no other work was performed. <br />until further <br />during the repor ng period on UG Working No. U6136. All drill <br />drilled to specified depth. <br />was performed. <br />� <br />diation efforts w re performed and completed on UG working No. U6( <br />No. U6163, No. U6164 and No U6165. Sites listed were excavated to I <br />.pending on the w6king remediated. The site for each working was then b <br />e planned subgrade elevation using the onsite structural fill (excavated r <br />rck of the CAT 330 excavator bucket. All backfill material was free of <br />nsidered remediated as specified <br />compacted by mlcethod specification. A GPS dozer was observed <br />embankment. j <br />1 <br />IP) are being performed. <br />were <br />No. <br />the <br />ities and obseniabon for underground working remediation efforts, H 67 <br />action, temporaryiunderdrain pipe placement, topsoil removal and field sampling <br />)orting period as required per project specifications. <br />I <br />testing continued with Permeability, Particle Size Distribution, Atierberg Limits, <br />ial classification and identifications and material sampling were perform4 during <br />Page 2 of I MLE2 WE 06.1 5.13.doc <br />