Secondary Underdraln: <br />No work was performed on the <br />A total of 1380 feet of <br />Primary Underdrain: <br />No work was performed on the <br />A total of 1280 feet of Primary t <br />Temporary Underdrain: <br />An amec field representative of <br />temporary underdrain pipe was <br />Underdrain Ponds: <br />Concrete for the underdrain Poi <br />Tree /Slash Clearing, Chippir <br />Seed Masters paused operation <br />B) Underground Workings <br />Confirmatory drilling complete <br />spaced on 4( + / -) foot centers <br />During this reporting period no i <br />During this reporting period re <br />U6037, No. 06160, No. U61& <br />refusal into rock varying depths <br />in 2 foot loose lifts to approxin <br />and 'bucket tamped" with the <br />material, ice and snow and are <br />C) Highway 67 <br />Fill continues to be placed <br />western downstream slope of <br />II) Storm Water Management <br />Best Management Practices <br />ACTIVITIES: <br />I) Field Activities: Construction a <br />embankment fill placement and cor <br />are field tasks performed during this <br />II) Laboratory Activities: Laboi <br />Moisture- Density, gradations and <br />this reporting period as required. <br />?condary underd in during this reporting period. <br />1, <br />underdrain has been completed. <br />underdrain <br />has <br />the fusing <br />I thru the i <br />luring this reporting period. <br />completed. <br />placement of the temporary underdrain pipe on June 19d, The <br />nkment per plans during this reporting period. <br />are complete, no other work was performed. <br />until further <br />during the repor ng period on UG Working No. U6136. All drill <br />drilled to specified depth. <br />was performed. <br />� <br />diation efforts w re performed and completed on UG working No. U6( <br />No. U6163, No. U6164 and No U6165. Sites listed were excavated to I <br />.pending on the w6king remediated. The site for each working was then b <br />e planned subgrade elevation using the onsite structural fill (excavated r <br />rck of the CAT 330 excavator bucket. All backfill material was free of <br />nsidered remediated as specified <br />compacted by mlcethod specification. A GPS dozer was observed <br />embankment. j <br />1 <br />IP) are being performed. <br />were <br />No. <br />the <br />ities and obseniabon for underground working remediation efforts, H 67 <br />action, temporaryiunderdrain pipe placement, topsoil removal and field sampling <br />)orting period as required per project specifications. <br />I <br />testing continued with Permeability, Particle Size Distribution, Atierberg Limits, <br />ial classification and identifications and material sampling were perform4 during <br />Page 2 of I MLE2 WE 06.1 5.13.doc <br />