Laserfiche WebLink
U <br />Q <br />V <br />O <br />6 <br />1 <br />AT CESSATION OF MINING AS A PART OF <br />FINAL RECLAMATION: REMOVE PORTION OF POND <br />EMBANKMENT AS MOWN TO ALLOW COMPLETE <br />DRAINAGE OF RETENTION POND. RECLAIM <br />DISTURBED AREAS IN ACCORDANCE WITH <br />SPECIFICATIONS PROVIDED FOR SITE RECLAMATION <br />AN ALTERNATIVE POND RECLAMATION SHALL BE <br />TO BACKFILL POND WITH NATIVE MATERIAL AND <br />GRADE SURFACE TO DRAIN <br />EX15Tq4 VIC" <br />O��RSION <br />EXISTING STORMWATER <br />RETENTION POND 10 <br />0 10 20 40 <br />SCALE- 1 " = 20' <br />REVISION ® RLC DATE 4/30/2013 DRAWN BY RLC DATE 7/20/2012 2350 G Road RETENTION POND 10 - POST RECLAMATION <br />.� <br />REVISION ®_ pgTE DESIGNED BY PMO DATE 7/20/2012 'Connor Junction, Co. 81505 <br />O Connor Design coup, Inc• Phone: (970) 241 -7125 CONFIGURATON <br />U <br />REVISION ®_ DATE CHECKED BY PMO DATE 7/20/2012 <br />Fax: (970) 241 -7852 COTTER CORPORATION MINE SM -18 SHEET 9 OF 11 <br />