Laserfiche WebLink
PERMIT #: M -1977 -493 <br />INSPECTOR'S INITIALS: ECS <br />INSPECTION DATE: July 3, 2013 <br />PHOTOGRAPHS <br />Photo 1 — new deep monitoring well in Tenmile drainage. <br />Photo 2 — new W WTP under construction below Mayflower <br />TSF. <br />Photo 3 — outlet of new Mayflower emergency bypass tunnel Photo 4 — tailings discharge and deposition area on top of <br />under construction. Tenmile TSF. <br />Photo 5 — new "starter berm" on top of Mayflower tailings <br />dam under construction. <br />Photo 6 — new process water handling pump barge area <br />under construction in Mayflower TSF. <br />Page 3 of 3 <br />