Laserfiche WebLink
approxhnately 10 to 20 percent of tl ►e total materials being produced, are being pumped underground into <br />the mine. <br />We were previously informed by Brian Watterson of Peabody that all of tine remaining monitor wells <br />installed in the Refuse Pile were destroyed in July 2012 and they will be installing new wells in the future. <br />Based on our limited observations and compaction test results, it appears that the pile is currently being <br />constructed and maintained in general accordance with the project specifications and plans submitted under <br />2.05.3(8) and that the potential hazard to human life and property at the site in its present condition is <br />minimal. This report fulfills the quarterly inspection requirements as specified by Rules 4.09.1(11)(x), <br />4.09.1(11)(b), 4.10.2(2)(x) and 4.10.2(2)(b). <br />If you have any questions regarding this report or our observations, please contact this office. <br />Sincerely, <br />NWCC, INC,, <br />Timothy S. Travis, P <br />Sr. Project Engineer <br />Reviewed by Brian <br />Principal Engineer <br />cc: Jason Musick — Environmental Protection Specialist - CDRM &S <br />Job Ntiniber. 99 -3983 NNvCC, [nc. Page 2 <br />