Laserfiche WebLink
RECEIVED <br />1�`� SS�� J Page 2of3 <br />JUN 2 0 2013 (' <br />110 ( p ort 2 Annual Re <br />®IMSION OF RECLAMATION - - <br />a <br />Permittee ame: <br />Central City Consolidated Mng <br />Permit Number: <br />M- 1990 -041 <br />Operation Name: <br />Bates - Hunter Mine <br />County: <br />Gilpin <br />Annual Fee Due: <br />$259.00 <br />Anniversary Date: <br />July 13, 2013 <br />Permit Acreage: <br />3.50 <br />Current Bond Amt: <br />$5,000.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is R- <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the I <br />dates for the beginning of active operations, and the date active operations ceased for the year. a <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />11. Estimated acres to be reclaimed in the next report year. a /' 0 -- <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acres <br />Total acres <br />1. <br />Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />CYEJ NO <br />2. <br />Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />ES NO <br />3. <br />Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES CO <br />1? 0/%e <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />1),019 P <br />4. <br />What was the date of last excavation, processing or hauling activity at the mine? <br />O b <br />5. <br />Does the mine operate more than 180 days per year <br />YES <br />replaced: <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />\\� <br />6. <br />Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />ES NO <br />Total acres <br />b) approval for INTERMITTENT OPERATION? <br />YES N�Q <br />7. <br />Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />Gt <br />8. <br />Number of acres that were newly affected during the current report year. <br />fertilized w/ <br />9. <br />Number df acres that were reclaimed during the current report year. <br />12G li °e- <br />10. <br />Estimated new acreage to be affected in the next report year. <br />°u- <br />11. Estimated acres to be reclaimed in the next report year. a /' 0 -- <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled: <br />0,0 n (f <br />seeded w/ <br />1? 0/%e <br />w /topsoil <br />1),019 P <br />mulched w/ <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />©9 <br />fertilized w/ <br />h `°- <br />replacement <br />rate (tons): <br />�n <br />apvd fertilizer: <br />depth (in.): <br />Seed <br />Fertilizer <br />Mulch <br />application <br />p <br />application <br />17,n n e <br />application <br />method: <br />method: <br />method: <br />