Laserfiche WebLink
Page 3 of 4 <br />13. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO N/A <br />If "NO" please explain: <br />14. If exploration has exposed groundwater, is the site in compliance with the approved mining plan and Office of the <br />State Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO N/A <br />dv �Io�us a w 01 <br />15. Are alIX2 materials stored within approved spill containment structures? YES NO /A <br />16. Does your NOI reclamation plan or Environmental Protection Plan require you to submit monitoring i ation <br />annually? Al lW �- {� i cVdtAt_ k S,(y t s YES �N N/A <br />If "Yes", please attach the required monitoring results to this Annual Report as required by Rule 1.15(1)(c). <br />17. As required by Rule 5.6(1)(g) submit with this report documentation to show that the Financial Warranty is still in <br />place and is adequate to fully reclaim the approved prospecting site disturbance(/s). <br />FINANCIAL WARRANTY DOCUMENTATION ATTACHED: <br />18. Please use the space below to describe as required by Rule 5.6(1)(c) any new prospecting activity that occurred during <br />the preceding year, including the locations and number of new surface drill holes, mud pits, excavations, rock dumps, <br />adits, shafts, trenches, pits, roads and structures. If applicable, you must also describe the measures taken to safeguard <br />shafts, adits and other mine openings from unauthorized entry both during and after prospecting. Additional pages <br />should be attached if needed. <br />� r,gaJ WcLs Unlau*Ljll� <br />Vc�ov <br />1-e J, -S <br />e- r� -`�-f- <br />4&y" <br />J <br />