My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-08_PERMIT FILE - M2012052
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2012052
>
2013-07-08_PERMIT FILE - M2012052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:22:16 PM
Creation date
7/9/2013 3:45:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012052
IBM Index Class Name
PERMIT FILE
Doc Date
7/8/2013
Doc Name
COMMENTS
From
DWR
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WATER RESOURCES <br />Response to Reclamation Permit Application Consideration <br />DATE: July 8, 2013 <br />TO: Timothy A. Cazier, Environmental Protection Specialist <br />CC: Division 2 Office; District 12 Water Commissioner <br />FROM: Melissa A. Peterson, P.E. /W <br />RE: Providence Mine, File No. M- 2012_052 <br />Operator: Providence Mining, LLC. <br />Contact: Shannon P. Murphy <br />Section 18, Twp 18S, Rng 69W, 6"' P.M., Teller County <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Dick Wolfe, P.E. <br />Director /State Engineer <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on -site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />❑ The proposed operation will consume ground water by: ❑ evaporation, ❑ dust control, <br />❑ reclamation, ❑ water removed in the mined product, ❑ processing, ❑ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />❑ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />® Other: Water used for dust control will be trucked from the City of Cripple Creek, <br />COMMENTS: <br />Office of the State Engineer <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303 - 866 -3581 • Fax: 303 -866 -3589 <br />www.water.state.co.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.