Laserfiche WebLink
TC plan sampling sites, parameters, and frequency <br />The TC plan has the following sampling requirements. <br />Station name <br />Location <br />Parameters <br />Frequency <br />Same as in active <br />All NPDES <br />mining monitoring <br />Same as in active mining monitoring <br />outfalls <br />various <br />plan (pages 1 -14 of <br />plan <br />Exhibit 29) <br />Full suite as <br />Wms Fk. <br />described for this <br />Annually, between July 20 and <br />WF -1 <br />station in active <br />August 30, during mine pumping, if <br />upstream <br />mining monitoring <br />any. <br />plan <br />Full suite as <br />Wms. Fork <br />described for this <br />WF -2 <br />downstream <br />station in active <br />Concurrent with WF -1 sample. <br />mining monitoring <br />plan <br />Water level and field <br />Wms. Fk. <br />parameters as <br />AVF -5 <br />alluvium <br />described in active <br />Concurrent with WF -1 sample. <br />downstream <br />mining monitoring <br />plan. <br />Water level of <br />7 North <br />sumped water at <br />#5 Mine sump <br />Angle <br />wellbore location. <br />Quarterly <br />wellbore <br />(An elevation below <br />pump elevation may <br />be reported as such.) <br />Middle <br />Water level and field <br />Sandstone <br />downdient <br />gra <br />gra <br />parameters as <br />Well TR -7A <br />from 5 <br />described for this <br />Annually <br />and 6 Mine <br />well in active mining <br />workings <br />monitoring plan. <br />TR13 -35 D -2 May 22, 2013 <br />