Laserfiche WebLink
f))Pr C, <br />MP Annual Report <br />aK-yc.- <br />Page 2 of 4 <br />Permittee Name: <br />Gold Hill Minerals, Inc <br />Permit Number. <br />P- 2012 -006 <br />eration Name: <br />Bueno Mining Mill <br />County: <br />Boulder <br />Annual Fee Due: <br />$86.00 <br />Anniversary Date: <br />July 9, 2013 <br />Permit Acreage: <br />0.65 <br />Current Bond Amt: <br />$18,500.00 <br />According to Colorado Statute, each year, on the anniversary date of the permit, an operator shall submit the Annual Fee, <br />an Annual Report and Map showing the extent of current disturbances to affected land, required monitoring information, <br />reclamation accomplished to date and during the preceding year, any new disturbance that is anticipated to occur during <br />the upcoming year, any reclamation that will be performed during the upcoming year, the dates for the beginning of active <br />operations, and the date active operations ceased for the year. <br />Information contained in this report is required and will be reviewed by the Division upon receipt and prior to the next <br />compliance inspection -o€ -the site. - if, while completing this report; you-learn that, Yom site is not iircompliance with -the - <br />rules and the act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the affected area boundary clearly marked if you have an excavation or portal? YES NO <br />2. Is the site in final reclamation? %J�� G S s� J� Y it - >�i�� �, , J ` , , _YES�l NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />3. What was the date of last exploration activity? ! a w - 2-C t <br />4. What date did prospecting activity end, or what date is it expected to end? Rule 5.6.1(e). <br />5. Number of acres currently affected (exploration+ incomplete reclamation). Q P <br />6. Number of acres that were newly affected during the current report year. C . <br />7. Number of acres that were reclaimed during the current report year. RECEIVED f <br />8. Estimated new acreage to be affected in the next report year. d ft Q 8 2 Q j 3 <br />9. Estimated acres to be reclaimed in the next report year <br />DIVISION OF RECLAMATION) F'• r` ; 7 <br />MINING AND SAFETY <br />10. Total acres in various stage -q nfrrx- lamatinn cinrr• nPnri++� U_ <br />Total acres <br />Total acres <br />Total acres v <br />�� f _Total <br />acres <br />/ <br />backfilled: <br />J <br />seeded w/ <br />^!` <br />w /topsoil <br />mulched w/ <br />1, <br />approved mix: <br />' '' <br />replaced: <br />approved mulch: <br />hr <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />traded: <br />: <br />fertilized w/ <br />replacement <br />rate (tons/ac): <br />a vd fertilizer: <br />depth (in). <br />Seed <br />Fertilizer <br />Mulch <br />application <br />i , <br />application <br />application <br />method: <br />method: <br />method: <br />11. Is weed control being conducted in accordance with an approved Weed Control Plan? 2eon S NO N/A <br />If "YES ", indicate the weed species, control area, control type, application rate and treatment the report map. <br />12. Is adequate topsoil reserved for reclamation, based on your approved NOI? YES NO � AD <br />If "NO ", please explain: / <br />