Laserfiche WebLink
Page 2 of 2 <br />10. Text indicating limited impact to the Nysa roadside skipper <br />• Complete <br />11. Update regarding prime farmlands <br />• Complete <br />12. Page 2.05 -27i needs removed <br />• Complete <br />13. Page 2.05 -28 referencing Figure 10 <br />• Complete <br />14. Reference areas <br />• Complete <br />15. to 19. Map questions <br />• The updated maps have not been received. Incomplete <br />20. All holes, wells, etc. in one table <br />• Complete <br />21. to 23. Map and on- the - ground issues <br />• The updated maps have not been received. Incomplete <br />24. (a) Drainage design for SAE off the east side of the cell tower <br />• Complete <br />24. (b) to 24(f). Map questions and updates <br />• The updated maps have not been received. Incomplete <br />25. Naming conventions for development waste piles <br />• Complete <br />26. (a) Accurate topsoil balance information <br />• Complete <br />26. (b) Location of topsoil piles shown on a map <br />• Complete <br />26. (c) Topsoil and subsoil volumes <br />• Complete <br />In accordance with Rule 2.07.3(1), you have the opportunity to amend, review, or otherwise make <br />your application complete. <br />If you have any questions, please contact me. <br />Sincerely, <br />x rv� ?�- � <br />Leigh D. Simmons <br />Environmental Protection Specialist <br />Leigh. simmons @state. co.us <br />cc. Kent Gorham, Gorham Energy Consultants LLC <br />C -TR -01 <br />