My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-01_GENERAL DOCUMENTS - C1981018
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981018
>
2013-07-01_GENERAL DOCUMENTS - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:21:52 PM
Creation date
7/8/2013 1:27:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
General Documents
Doc Date
7/1/2013
Doc Name
Proposed Decision & Findings (PR8)
From
DRMS
To
Blue Mountain Energy, Inc
Permit Index Doc Type
Findings
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPLICANT MUST SUBMIT A MAP SHOWING EACH AREA OF LAND ON THE <br />PROPOSED PERMIT AREA FOR WHICH A PERFORMANCE BOND WILL BE <br />SUBMITTED, SUBMIT A DESCRIPTION OF ACTIVITIES TO OCCUR ON THOSE AREAS <br />OF LAND, AND IDENTIFY THE AMOUNT OF PERFORMANCE BOND TO COVER <br />RECLAMATION COSTS ASSOCIATED WITH EACH AREA OF LAND. NOTE: THIS IS <br />ACTUALLY STIPULATION NO. 1(B) IN REAL LIFE. <br />Status: This stipulation was satisfied and terminated on August 27, 1981. <br />Stipulation No. 36: <br />INSTALLATION OF METAL FLUME TO CONVEY RUNOFF FROM NE PORTION OF <br />WASH PLANT BENCH TO COLLECTOR DITCH LOCATED SOUTH OF SHOP. <br />OPERATOR TO SUBMIT REVISED MAPS FOR MR -40. SUBMITTAL SHOULD <br />INCLUDE MAP NO. 24, 56. <br />Status: This stipulation was satisfied and terminated on August 12, 1988. <br />Stipulation No. 37: <br />INSTALLATION OF HAUL ROAD CROSSING NEAR GUARD SHACK. OPERATOR TO <br />SUBMIT REVISED MAPS FOR MR -41. THE SUBMITTAL SHOULD INCLUDE REVISED <br />MAP NO. 27. <br />Status: This stipulation was satisfied and terminated on August 5, 1988. <br />Stipulation No. 38: <br />INSTALLATION OF FOUR SHORT LIGHT DUTY ROAD SEGMENTS TO ACCESS <br />POWERLINE TRANSFORMERS. OPERATOR TO SUBMIT REVISED MAPS FOR MR -42. <br />THE SUBMITTAL SHOULD INCLUDE REVISED MAPS 27, 77 AND 109. <br />Status: This stipulation was satisfied and terminated on August 5, 1988. <br />Stipulation No. 39: <br />INSTALLATION OF TEMPORARY ROADBASE STOCKPILE. SUBMIT REVISED MAP <br />NO. 77 AND REVISED TEXT SECTIONS AS NECESSARY. SUBMIT REVISED <br />MAPSAND PAGES FOR MR NO. 44. <br />Status: This stipulation was satisfied and terminated on December 31, 1988. <br />Stipulation No. 40: <br />INSTALLATION OF ROADBASE STORAGE BIN AT EAST INTAKE FACILITY. <br />REVISED MAP NO. 85 AND REVISED TEXT AS NECESSARY. SUBMIT REVISED <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.