Laserfiche WebLink
APPLICANT MUST SUBMIT A MAP SHOWING EACH AREA OF LAND ON THE <br />PROPOSED PERMIT AREA FOR WHICH A PERFORMANCE BOND WILL BE <br />SUBMITTED, SUBMIT A DESCRIPTION OF ACTIVITIES TO OCCUR ON THOSE AREAS <br />OF LAND, AND IDENTIFY THE AMOUNT OF PERFORMANCE BOND TO COVER <br />RECLAMATION COSTS ASSOCIATED WITH EACH AREA OF LAND. NOTE: THIS IS <br />ACTUALLY STIPULATION NO. 1(B) IN REAL LIFE. <br />Status: This stipulation was satisfied and terminated on August 27, 1981. <br />Stipulation No. 36: <br />INSTALLATION OF METAL FLUME TO CONVEY RUNOFF FROM NE PORTION OF <br />WASH PLANT BENCH TO COLLECTOR DITCH LOCATED SOUTH OF SHOP. <br />OPERATOR TO SUBMIT REVISED MAPS FOR MR -40. SUBMITTAL SHOULD <br />INCLUDE MAP NO. 24, 56. <br />Status: This stipulation was satisfied and terminated on August 12, 1988. <br />Stipulation No. 37: <br />INSTALLATION OF HAUL ROAD CROSSING NEAR GUARD SHACK. OPERATOR TO <br />SUBMIT REVISED MAPS FOR MR -41. THE SUBMITTAL SHOULD INCLUDE REVISED <br />MAP NO. 27. <br />Status: This stipulation was satisfied and terminated on August 5, 1988. <br />Stipulation No. 38: <br />INSTALLATION OF FOUR SHORT LIGHT DUTY ROAD SEGMENTS TO ACCESS <br />POWERLINE TRANSFORMERS. OPERATOR TO SUBMIT REVISED MAPS FOR MR -42. <br />THE SUBMITTAL SHOULD INCLUDE REVISED MAPS 27, 77 AND 109. <br />Status: This stipulation was satisfied and terminated on August 5, 1988. <br />Stipulation No. 39: <br />INSTALLATION OF TEMPORARY ROADBASE STOCKPILE. SUBMIT REVISED MAP <br />NO. 77 AND REVISED TEXT SECTIONS AS NECESSARY. SUBMIT REVISED <br />MAPSAND PAGES FOR MR NO. 44. <br />Status: This stipulation was satisfied and terminated on December 31, 1988. <br />Stipulation No. 40: <br />INSTALLATION OF ROADBASE STORAGE BIN AT EAST INTAKE FACILITY. <br />REVISED MAP NO. 85 AND REVISED TEXT AS NECESSARY. SUBMIT REVISED <br />13 <br />