Laserfiche WebLink
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St , Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />STATE of COLOKADO <br />COLORADO <br />D I V1 S I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />John W Hickenlooper <br />July 1, 2013 Governor <br />Mike King <br />Connie Davis Executive Director <br />Aggregate Industries - WCR, Inc. Loretta E Rneda <br />1687 Cole Blvd., Ste. 300 Director <br />Golden, CO 80401 <br />Re: Hazeltine Mine, Technical Revision Approval, Permit No. M- 2004 -031, Revision No. TR -2 <br />Dear Ms. Davis: <br />On July 1, 2013 the Division of Reclamation, Mining and Safety approved the Technical Revision application submitted to <br />the Division on May 1, 2013, addressing the following: <br />East perimeter Agri drain and pipeline through slurry wall to draw down the water from the adjacent land. This <br />TR supersedes TR #1 that was approved on 111612013, but was never implemented. <br />The terms of the Technical Revision No. 2 approved by the Division are hereby incorporated into Permit No. M- 2004 -031. <br />The conditions of the Division approval are noted below. Please note that all other provisions of Permit No. M- 2004 -031 <br />remain in full force and effect. <br />Stipulation No. 1 <br />Aggregate Industries will submit a technical revision for the rip rap design channel that will be incorporated into <br />the reservoir slope during final reclamation activities to prevent excessive slope erosion. The design has to be <br />approved by the Division as part of the final reclamation plan for the site. ;A <br />If you have any questions, please contact me. <br />Sincerely, <br />Berhan Keffelew <br />Environmental Protection Specialist <br />CC: Tony Waldron <br />Tom Kladenbach <br />Office of <br />Office of <br />Mined Land Reclamation <br />Denver • Grand )unction • Durango Active and Inactive Mines <br />