My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-25_GENERAL DOCUMENTS - P2011012 (2)
DRMS
>
Day Forward
>
General Documents
>
Prospect
>
P2011012
>
2013-06-25_GENERAL DOCUMENTS - P2011012 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:21:42 PM
Creation date
7/3/2013 3:16:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011012
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
6/25/2013
Doc Name
DECISION RECORD
From
BLM
To
DRMS
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 - Conditions of Avoroval <br />The following conditions of approval are taken from section 2.2.8 of the RM <br />Potash Exploration Project EA. <br />Reclamation <br />Following the reclamation activities, each drill site area will be fenced with <br />three -strand wire and t -posts to aid in reclamation success by preventing <br />livestock and /or big game access to seeded areas. Once the reclamation has <br />been deemed successful according to appropriate criteria, the fence will be <br />removed. <br />For any road construction /improvement /widening where vegetation is beyond <br />recovery and compaction of the road bed has occurred, then the following <br />measures will be required on an as- needed basis: <br />• Re- grading any cuts and fills to re- establish the original ground contours <br />and drainages. <br />• Construction of drainage dips at the appropriate spacing. <br />• Any access across private land will be reclaimed back to the original <br />condition, or may be left in its improved state, as per the desires of the <br />private land owner. <br />• Ripping the new road construction to a depth of 12 to 18 inches. <br />• Placing 6 inches of loose topsoil in locations where topsoil was removed <br />(if applicable). <br />• Seeding the soil with a BLM- approved seed mix following ripping and <br />before physical crusts form on the soil surface. <br />• Placing slash (shrubs and woody material removed from the route to <br />make it passable) on the reclaimed road bed as a final step, alternately <br />slash may be incorporated into the topsoil and the road compacted to <br />prevent erosion. <br />• Approximately the first 100 feet of the access road may be ripped, <br />seeded, and blocked even if the rest of the road does not need <br />reclamation treatment, at BLM's discretion. <br />Additional applicable general reclamation measures will also be implemented <br />for the overall Project and include: <br />• Closed loop, pitless drilling systems will be used. Water -based cuttings <br />will be dried on site and stored on pads for future on -site burial or off - <br />site disposal. Oil -based cuttings will be stored in steel containers and <br />transported off site to a licensed, commercial waste disposal facility. <br />• Reclamation of drill sites and access roads will include weed control for <br />three years post reclamation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.