My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-25_GENERAL DOCUMENTS - P2011012 (2)
DRMS
>
Day Forward
>
General Documents
>
Prospect
>
P2011012
>
2013-06-25_GENERAL DOCUMENTS - P2011012 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:21:42 PM
Creation date
7/3/2013 3:16:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011012
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
6/25/2013
Doc Name
DECISION RECORD
From
BLM
To
DRMS
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transportation /Access <br />The following restrictions, requirements, and considerations will be <br />implemented, as applicable, during Project activities related to <br />transportation/ access issues: <br />• RM Potash will need to obtain applicable road use permits from San <br />Miguel and Dolores Counties prior to using County roads for Project <br />activities, which could potentially include posting applicable bonds. <br />• All Project - related vehicles will adhere to posted speed limits on roads. <br />Oversize and articulated vehicles will be restricted to 35 mph or less on <br />access roads, as conditions warrant. <br />Speed limits along the existing County Line Road /CR F4E road will be <br />reduced to 15 mph for all oversized and articulated Project - related <br />vehicles between Highway 141 and CR F11 road and during known <br />school bus routes between the hours of 6:45 -8 am and 4 -5:15 pm during <br />scheduled school days. These times will be verified with the Dolores <br />County School District prior to Project activities. Further, during these <br />hours any other Project related traffic will need to maintain speed limits <br />10 mph lower than posted limits along known school bus routes. <br />If the reduced speed limits are not adequate for dust control, RM Potash <br />will need to implement appropriate dust control methods to minimize <br />dust. <br />• Project- related vehicle parking will be restricted to either County <br />designated parking areas or areas cleared for the Project (i.e., drill pads). <br />
The URL can be used to link to this page
Your browser does not support the video tag.