Laserfiche WebLink
Justification for this request is that there are many environmental protection features <br />that need to be accounted for in the EPP: <br />• Planning and engineering for current storm water structures. <br />• Planning and implementation of surface and ground water monitoring plans. <br />• Planning and continued implementation of the waste rock characterization <br />plan. <br />If DRMS concurs, RGS will submit the EPP on or before May 24, 2014. <br />Sincerely, <br />4 �4 (C ("' � <br />Randy McClure <br />General Manager <br />�®RIOGRANK <br />s,I.VER IN( <br />PO Box 610 <br />625 USFS Road 504 IA <br />Creede, CO 81130 <br />ph: 719.658.1080 ext 2701 <br />cell. 970.317.5355 <br />fax 719.658 1082 <br />rmcclure@heclo- minina.com <br />Cc: Julie Murphy — AGO <br />Russ Means — GJFO <br />Bob Oswald - DFO <br />2 <br />