My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-03_REVISION - C1981022
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2013-07-03_REVISION - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:22:12 PM
Creation date
7/3/2013 12:28:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
7/3/2013
Doc Name
Adequacy Review #1 letter & Cost Estimate
From
DRMS
To
Oxbow Mining, LLC
Type & Sequence
TR74
Email Name
BFB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task # 360 Page 3 of 14 <br />Task description: <br />Site: Elk Creek Mine <br />BULLDOZER WORK <br />Drill Pads <br />Permit Action: Technical Revision 74 <br />PROJECT IDENTIFICATION <br />Task #: 362 State: Colorado <br />Date: 7/2/2013 County: Delta <br />User: BFB <br />Agency or organization name: DRMS <br />HOURLY EQi <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />APMENT COST <br />Cat D9T - 9SU <br />405 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />Permit/Job #: C1981022 <br />Abbreviation: None <br />Filename: CO22 -362 <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $249.42 <br />MATERIAL QUANTITIES <br />Utilization % <br />Ownership Cost/Hour: <br />$69.88 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $249.42 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />10,890 <br />Swell factor: <br />1.125 <br />Loose volume: <br />12,251 LCY <br />Source of estimated <br />volume: Division of Reclamation, Mining & Safety <br />Source of estimated <br />swell Cat Handbook <br />factor <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly 1,243.2 LCY/hr <br />production: <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 5% <br />Average site altitude: 8,200 feet <br />Material weight: 2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.000 (CAT HB) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.