Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 004 Page 2 of 2 <br />Visibility: <br />1.000 <br />? (AVG.) <br />Job efficiency: _ <br />0.830 <br />(1 SHIFT /DAY) <br />Spoil pile: <br />0.800 <br />(SSD -AC) <br />Push gradient: <br />1.000 <br />j (CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.868 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.4755 <br />Adjusted unit production: 144.22 LCY /hr <br />Adjusted fleet production: 144.22 LCY /hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.872/LCY <br />Total job time: 5.661-lours_ <br />Total job cost: $712.51 <br />CIRCES Cost Estimating Software <br />