Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 006 Page 2 of 2 <br />EOUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />CANON CITY <br />Total one -way travel distance: <br />8.00 miles <br />Average Travel Speed: <br />25.00 mph <br />Total Non - Roadable Mob /Demob Cost * <br />_ <br />0.32_ <br />`* two round trips with haul rig: <br />$1,832.29 <br />Total Roadable Mob /Demob Cost ** <br />_ 0.500— NA <br />** one round trip, no haul rig: <br />$32.48 <br />Transportation Cycle Time: <br />JOB TIME AND COST <br />Total job time: 3.28 Hours <br />Total job cost: $1,864.77 <br />CIRCES Cost Estimating Software <br />Non - Roadable Roadable <br />Equipment <br />Equipment <br />Haul Time (Hours): <br />0.32 0.32 <br />Return Time (Hours): <br />_ <br />0.32_ <br />Loading Time (Hours): <br />_0.32 _ <br />_ 0.50 NA <br />Unloading Time (Hours): <br />_ 0.500— NA <br />Subtotals: <br />1.64 r 0.64 <br />JOB TIME AND COST <br />Total job time: 3.28 Hours <br />Total job cost: $1,864.77 <br />CIRCES Cost Estimating Software <br />