My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-01_REVISION - M1999120
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999120
>
2013-07-01_REVISION - M1999120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:26:29 PM
Creation date
7/2/2013 2:27:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999120
IBM Index Class Name
REVISION
Doc Date
7/1/2013
Doc Name
Acreage Release Request
From
L.G. Everist, Inc.
To
DRMS
Type & Sequence
AR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L.G. EVERIST, INC. <br />RocK .SOLID SuvcE 1876 <br />June 11, 2013 <br />Ms. Lisa Darling <br />City of Aurora <br />Water Resources Division <br />15151 E Alameda Pkwy, 3rd Floor <br />Aurora, CO 80012 <br />7321 E. 88TH AvENuE, SuITE 200 <br />HENDERSON, COLORADO 80640 <br />PHONE 303 - 287 -9606 • FAx 303 - 289 -1348 <br />RE: Acceptance of Reclamation of L.G. Everist, Inc.'s Fort Lupton Sand and Gravel Mine, <br />DRMS Permit M- 1999 -120 - Hill - Oakley Phase and Fort Lupton East Phase <br />Dear Ms. Darling, <br />Reclamation has been completed on the Hill - Oakley and Fort Lupton East Phases of L.G. Everist, Inc.'s Fort <br />Lupton Sand and Gravel Mine, M- 1999 -120 - including the slurry wall liners, backfilling, sloping, grading and <br />seeding of the site. The slurry wall liners of both phases have passed the leak test required by the Colorado <br />Office of the State Engineer (SEO) and have continued to meet the SEO design standard. The Fort Lupton East <br />phase had additional slope construction done in 2012 with the design and QA/QC monitoring by Deere & Ault. <br />The initial seeding was completed around the upper reaches of the reservoirs in April -2012. Copies of the two <br />SEO approval letters and the seeding invoice are attached for your reference. <br />Ted Hartfelder, Aurora Water Projects Manager, inspected the areas on Monday, June 10, 2013, and found them <br />to be more than satisfactory. So, with reclamation complete and site Inspection done on the -Hill- Oakley and Fort <br />Lupton East Phases, L. G. Everist, Inc. respectfully requests an acknowledgment of acceptance from the City of <br />Aurora (Aurora) to receive the reclaimed areas as is. <br />As you know, L.G. Everist modified our Division of Reclamation, Mining, and Safety (DRMS) reclamation permit <br />on the Fort Lupton site with Technical Revision TR -04, in 2009. The revision states, "Modify final vegetation <br />standard to allow release prior to full vegetation establishment, all other reclamation standards remain in effect." <br />Of course, DRMS appreciates knowing that acreage released from the permit will be taken over by a responsible <br />party, hence why we would like to include this acceptance letter in our DRMS acreage release request for the Hill - <br />Oakley and Fort Lupton East Phases. <br />Thank you for acknowledging acceptance of the Hill - Oakley and Fort Lupton East Phases as is, and please return <br />a signed copy of the letter to me so that I can include it in my release request to the DRMS <br />If you have any questions, please contact me at 303 - 286 -2247 or by email (Imshults @lgeverist.com). <br />4nere I y, <br />a yer Shults <br />Regulatory Manager <br />cc: Austin Hamre, Esq Special Water Counsel for Aurora Water <br />Dennis Fields, L.G Everist, Inc. <br />FL -DRMS- Aurora- HillOakley &FLEastAsls- 061113 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.