Laserfiche WebLink
%��• t,�i i y� �� Page 2 of 3 <br />110c Annual Report <br />Permittce Name: <br />Cross Mountain Ranch Ltd. <br />Partnership <br />Permit Number: <br />M -1979 -102 <br />Operation Name: <br />Kagie Gravel Pit <br />County: <br />Routt <br />Annual Fee Due: <br />$323.00 <br />Anniversary Date: <br />June 21, 2013 <br />Permit Acreage: <br />9.00 <br />Current Bond Amt: <br />$14,247.50 <br />According to C .R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning ofactive operations, and the date active operations ceased for the year. <br />information contained in this report %will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES NO <br />2. is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? L o(L 2013 <br />5. Does the mine operate more than 180 days per year? YES C <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. ReelvivLaID <br />10. Estimated new acreage to be affected in the next report year. JUN 9 h yo <br />11. Estimated acres to be reclaimed in the next report year. OMOFRWh* #A" <br />12. Total acres in various stages of reclamation, since permitted mining ac ►v�i 90 ,�' <br />YES <br />ES NO <br />F11 rc. ro c <br />Total acres <br />backfilled: <br />Total acres <br />seeded w/ <br />approve mix: <br />Total acres <br />w /topsoil <br />replaced: <br />Total acres <br />mulched w/ <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />fertilized w/ <br />replacement <br />rate (tons/ac): <br />apvd fertilizer: <br />depth (in.): <br />Seed <br />Fertilizer <br />Mulch <br />application <br />application <br />application <br />method: <br />method: <br />method: <br />Thy J ash re � c- ovta�ioyi Wank k&%a,s GLrNi0tc-+e -d pnor Jo 9q, <br />