Laserfiche WebLink
Justification for this request is that there are many environmental protection features <br />that need to be accounted for in the EPP: <br />• Planning and engineering for current storm water structures. <br />• Planning and implementation of surface and ground water monitoring plans. <br />• Planning and continued implementation of the waste rock characterization <br />plan. <br />If DRMS concurs, RGS will submit the EPP on or before May 24, 2014. <br />Sincerely, <br />VY <br />Randy McClure <br />General Manager <br />�HIOGRANDF <br />SII.vF.rt. tvc:. <br />PO Box 610 <br />625 USFS Road 504.1A <br />Creede, CO 81130 <br />ph: 719.658.1080 ext 2701 <br />cell: 970.317.5355 <br />fax: 719.658.1082 <br />rmcclure@hecla-minincl.com <br />Cc: Julie Murphy — AGO <br />Russ Means — GJFO <br />Bob Oswald - DFO <br />