Laserfiche WebLink
oo <br />N 1,450.000 DM-5 <br />+/ w 70983 <br />D 14 <br />co 7.9 40 <br />CREST AT —7105 00' <br />PETROLEUM CONTAMINATED—'-" <br />_),�SOILS TREATMENT AREA <br />)1`7076 46 0 <br />19L J� 27A r'll <br />;10 N 1,479,500 <br />71MM 2, <br />79,500 + <br />7074 07 <br />7064 89 x <br />N 1,479,000 + 11 1.479,.0. <br />o <br />cs <br />ISNYDER PILE <br />CREST AT —7076 50" <br />)K 7061 41 <br />7061 15 NOTES: <br />1 ). THE LIMITS,OF FEATURES SHOWN AND DESIGN <br />ASSUMPTIONS ARE BASED ON INTERPRETATIONS <br />OF SURFICIAL CONDITIONS AND RECENT TOPOGROPHY. <br />ob UNFORSEEN FIELD CONDITIONS WILL LIKELY BE <br />ENCOUNTERED REQUIRING MODIFICATIONS TO LIMITS <br />N 1,47B.500 N 1,478,500 <br />AND/OR LOCATIONS OF DESIGN DETAILS. <br />2). ALL BOUNDARIES SHOWN ARE APPROXIMATE ONLY. <br />3). CONSTRUCTION ACTIVITIES SHOULD BE PERFORMED <br />USING METHODS THAT MINIMIZE ADVERSE IMPACTS <br />TO THE ENVIRONMENT. <br />4). POST RECLAMATION CONTOURS ARE INTENDED TO <br />SHOW GENERAL CONFIGURATION OF LAND USE ONLY. <br />5). REFER TO THE TECHNICAL SPECIFICATIONS FOR <br />CONSTRUCTION DETAILS. <br />oo <br />"0, v 110, <br />SCALE IN FEET <br />CONTOUR INTERVAL, 2' <br />LEGEND: <br />-------ExISTNC 10' CONTOUR <br />-------EX|5T|wG 2' CONTOUR <br />uwPAvED ROAD <br />------cREST OF w|wE SPOILS AREA <br />TOE OF w/wE spo/Ls AREA <br />w»���v- SURVEY CONTROL POINT <br />MINE SPOIL PILE AREA TABLE <br />SPOIL PILE: <br />AREA (ACRES): <br />BIGLER PILE <br />4.35 AC. <br />D-1 PILE <br />10.95 AC. <br />SNYDER PILE <br />9.35 AC. <br />TOTAL: <br />31.78'AC. <br />