Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />John W. Hickenlooper <br />Department of Natural Resources <br />Governor <br />1313 Sherman St., Room 215 <br />Mike King <br />Denver, Colorado 80203 <br />E <br />D COLORADO <br />DIVISION OF <br />Phone: (303) 866 -3567 <br />RECLAMATION <br />FAX: (303) 832 -8106 <br />MINING <br />June 26, 2013 <br />SAFETY <br />Ms. Paula Weeks <br />John W. Hickenlooper <br />Kit Carson County <br />Governor <br />251 16th Street <br />Mike King <br />P.O. Box 160 <br />Executive Director <br />Burlington, CO 80807 <br />Loretta E Pineda <br />Director <br />Re: Brenner Pit #2, M- 2013 -014, Permit Issuance - County Construction Material Operation <br />Dear Ms. Weeks: <br />On June 24, 2013 the Division of Reclamation, Mining and Safety found Kit Carson County to have satisfied the <br />applicable requirements of C.R.S. 34- 32.5 -101 et SeMc . for obtaining a mining and reclamation permit. Therefore, a permit <br />is being issued. Two signed originals of the permit have been executed. We have kept one copy for our files and are <br />enclosing one copy for your use. It is your responsibility to comply with all of the terms of the permit. <br />1. All of the original application materials, as amended and supplemented, are an integral part of your permit. They <br />have been incorporated into the permit by reference. We presume that you have a copy of all of these materials; <br />therefore, none have been enclosed with this mailing. We suggest that you keep a copy of the permit and the permit <br />application at the mining operation as a reference for operating personnel, to help ensure compliance with the terms of the <br />permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit may require a <br />modification to the permit. We suggest consulting the Construction Materials Rules and Regulations and/or contacting us <br />to determine if a revision to the permit is necessary. Rule 1.10 pertains to Amendments, Rule 1.9 to Technical Revisions, <br />and Rule 1.11 to Conversions. <br />3. On your permit anniversary date each year, June 24, you must submit an annual fee and an annual report to us. <br />The annual fee for this permit is $323.00. Please consult the Act, Rules and Regulations, and your permit for specific <br />annual report requirements applicable to your mine. <br />If you have any questions, please contact the Division. <br />Sincerely, <br />\9f/u-' v c'tl � <br />LORETTA E. PINEDA <br />Division Director <br />Enclosure <br />Certified Mail receipt No. 70113500 0002 9605 5655, return receipt requested <br />cc: Eric Scott, Division of Reclamation, Mining and Safety <br />Randy Schafer <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />