Laserfiche WebLink
Yoast Mine; C1994-082 Midterm Review No. 4 (MT4) Page 7 of 92 <br />BULLDOZER WORK <br />Task description: Regrade Access Road to Drill Pad #2 from Minor Revision 18 <br />Site: Yoast Mine Permit Action: MT4 Permit/Job #: C1994082 <br />PROJECT IDENTIFICATION <br />Task #: 022 State: Colorado <br />Date: 3/11/2013 County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQti <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat DIIR - IIU <br />850 <br />Universal <br />NA <br />1 per day <br />(CRG) <br />Abbreviation: None <br />Filename: C082 -022 <br />Total unit Cost/Hour: $444.88 <br />Total Fleet Cost /Hour: $889.76 <br />MATERIAL OUANTITIES <br />Initial Volume: 330 <br />Swell factor: 1.165 <br />Loose volume: 384 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency description <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />200 feet <br />1,560.0 LCY /hr <br />fill or embankment 0.9 <br />Average push gradient: 5 % <br />Average site altitude: 7,800 feet <br />Material weight: <br />Weight description: Decor <br />Job Condition Correction Factor <br />Operator Skill: <br />lbs /LCY <br />rock - 50% Rock, 50% Earth <br />0.750 <br />Source <br />'AVG.) <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$126.54 <br />NA <br />Operating Cost/Hour: <br />$280.92 <br />100 <br />Ripper op. Cost /Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $444.88 <br />Total Fleet Cost /Hour: $889.76 <br />MATERIAL OUANTITIES <br />Initial Volume: 330 <br />Swell factor: 1.165 <br />Loose volume: 384 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency description <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />200 feet <br />1,560.0 LCY /hr <br />fill or embankment 0.9 <br />Average push gradient: 5 % <br />Average site altitude: 7,800 feet <br />Material weight: <br />Weight description: Decor <br />Job Condition Correction Factor <br />Operator Skill: <br />lbs /LCY <br />rock - 50% Rock, 50% Earth <br />0.750 <br />Source <br />'AVG.) <br />CIRCES Cost Estimating Software <br />