Laserfiche WebLink
Yoast Mine; C1994-082 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Midterm Review No. 4 (MT4) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />(FND -RF) <br />0.903 <br />(CAT HB) <br />0.930 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.2985 <br />Adjusted unit production: <br />Adjusted fleet production <br />JOB TIME AND COST <br />856.78 LCY /hr <br />1713.56 LCY /hr <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.519 /LCY <br />Total job time: 1.09 Hours <br />Total job cost: $967.87 <br />Page 4 of 92 <br />CIRCES Cost Estimating Software <br />