Laserfiche WebLink
Yoast Mine; C1994-082 Midterm Review No. 4 (MT4) Page 1 of 92 <br />Task description: Cost Summa <br />Site: Yoast Mine <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />Permit Action: MT4 <br />Task #: OIA State: Colorado <br />Date: 3/12/2013 County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job #: C1994082 <br />Abbreviation: None <br />Filename: C082 -OIA <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />005 <br />014 <br />021 <br />022 <br />028 <br />02a <br />02b <br />02f <br />031 <br />032 <br />033 <br />034 <br />035 <br />036 <br />037 <br />03A <br />03b <br />03f <br />040 <br />041 <br />043 <br />044 <br />046 <br />049 <br />04a <br />04b <br />052 <br />053 <br />054 <br />Grade Drill Pads Associated with Minor Revision <br />18 <br />DOZER <br />2 <br />2 <br />1 <br />2 <br />1 <br />2 <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />1.09 <br />$967.87 <br />$10,106.00 <br />$165.00 <br />$367.29 <br />$4,620.00 <br />$56,001.76 <br />$6,941.47 <br />$1,585.70 <br />$7,848.45 <br />$25,006.71 <br />$13,923.07 <br />$92.00 <br />$170,632.69 <br />$7,440.52 <br />$11,621.29 <br />$20,258.10 <br />$3,543.55 <br />$809.03 <br />$34,246.99 <br />$25,890.61 <br />$49,779.17 <br />$95,124.81 <br />$121,594.90 <br />$59,366.21 <br />$21,067.13 <br />$22,426.30 <br />$561.55 <br />$213.10 <br />$204.09 <br />Rip Final Regraded Areas <br />RIPPER <br />10.66 <br />Grade Light-Use Roads <br />GRADER <br />1.21 <br />Regrade Access Road to Drill Pad #2 from Minor <br />Revision 18 <br />DOZER <br />0.41 <br />Finish Grade All Areas <br />GRADER <br />34.66 <br />Grade Valora Pit N/S Hi hwall <br />DOZER <br />62.94 <br />Grade Valora Pit E/W (Scraper Pit) Hi hwall <br />DOZER <br />7.80 <br />Grade Neck Pit Hi hwall <br />DOZER <br />1.78 <br />Re grade Pond 011 <br />DOZER <br />30.20 <br />Re grade Pond 012 <br />DOZER <br />96.23 <br />Re grade Pond 014 <br />DOZER <br />53.58 <br />Re grade Diversion 14A <br />GRADER <br />0.67 <br />Construct Post-Mining Drainage Channels <br />NA <br />544.97 <br />Re grade Pond I IA <br />DOZER <br />28.63 <br />Re grade Pond 12A <br />DOZER <br />44.72 <br />Grade Valora Pit N/S Spoil Ridges <br />DOZER <br />22.77 <br />Grade Valora Pit E/W (Scraper Pit) Spoil Ridges <br />DOZER <br />3.98 <br />Grade Neck Pit Spoil Ridges <br />DOZER <br />0.91 <br />Replace Topsoil from Stockpile A to Pond 010 <br />SCRAPERI <br />20.76 <br />Replace Topsoil from Stockpile B to Shop Area <br />SCRAPERI <br />15.70 <br />Replace Topsoil from Stockpile Haul Fill from to <br />Neck Pit <br />SCRAPER] <br />30.18 <br />Replace Topsoil from Stockpile I to Entrance Road <br />and Wad e <br />SCRAPERI <br />57.67 <br />Replace Topsoil from Stockpile L to Unreleased <br />Pond 12 Area <br />SCRAPERI <br />73.72 <br />Replace Topsoil from Stockpile P to Pond 13 Slide <br />Area <br />SCRAPERI <br />35.99 <br />Grade Remaining Valora Pit N/S Spoil Ridges <br />DOZER <br />23.68 <br />Grade Remaining Valora Pit E/W (Scraper Pit) <br />Spoil Ridges <br />DOZER <br />25.20 <br />Replace Topsoil from Stockpile to MR -18 Drill <br />Pads <br />DOZER <br />0.63 <br />Replace Topsoil from Stockpile to MR -18 Access <br />Road <br />DOZER <br />0.24 <br />Replace Topsoil from Stockpile to Pond 010 <br />DOZER <br />1 0.23 <br />CIRCES Cost Estimating Software <br />