My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-12_PERMIT FILE - C1994082 (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1994082
>
2013-06-12_PERMIT FILE - C1994082 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:21:22 PM
Creation date
6/27/2013 10:07:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Permit File
Doc Date
6/12/2013
Doc Name
Bond Cost Worksheets
Section_Exhibit Name
Tab 25 Attachment 25-1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Yoast Mine; 01994 -082 Midterm Review No. 4 (MT4) <br />BULLDOZER WORK <br />Task description: Grade Neck Pit Highwall <br />Site: Yoast Mine Permit Action: MT4 <br />PROJECT IDENTIFICATION <br />Task #: 02F State: Colorado <br />Date: 3/11/2013 County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQti <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat DIIR- 11U <br />850 <br />Universal <br />NA <br />I per day <br />(CRG) <br />Page 15 of 92 <br />Permit/Job #: C1994082 <br />Abbreviation: None <br />Filename: C082 -02f <br />Total unit Cost/Hour: $444.88 <br />Total Fleet Cost/Hour: $889.76 <br />MATERIAL QUANTITIES <br />Utilization % <br />Ownership Cost /Hour: <br />$126.54 <br />NA <br />Operating Cost /Hour: <br />$280.92 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $444.88 <br />Total Fleet Cost/Hour: $889.76 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />9,800 <br />Swell factor: <br />1.000 <br />Loose volume: <br />9,800 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated <br />swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />100 feet <br />2,870.3 LCY /hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: -25 % <br />Average site altitude: 7,800 feet <br />Material weight: 2,5501bs /LCY <br />Weight description: Sandstone <br />Job Condition Correction Factor <br />Operator Skill: <br />0.750 <br />Source <br />'AVG.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.