My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-02-28_PERMIT FILE - C1994082A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1994082A
>
2006-02-28_PERMIT FILE - C1994082A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:16:19 PM
Creation date
6/27/2013 9:31:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082A
IBM Index Class Name
Permit File
Doc Date
2/28/2006
Doc Name
Bond Cost Worksheets
Section_Exhibit Name
Tab 25 Attachment 25-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />• <br /> PROJECT IDENTIFICATION <br /> Date : 06-Dec-2005 Permit or job no.: C-1994082 <br /> User : JRS Abbreviation : none <br /> Task : OOf Filename : C082-OOf <br /> Agency or organization name :Colorado Division Of Minerals And Geol <br /> Permit or job action :Permit Renewal 02 <br />Task description :Topsoil Replacement Tasks -Tasks 038A57 <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />038 -Replace Topsoil from Stockpile A to Pond 010 scraped 4 24.0 $29,579 <br />039 -Replace Topsoil from Stockpile 8 to Shop Area scraped 4 16.1 $19, 894 <br />040 -Replace Topsoil from Stockpile C to Haul Road 8 scraped 4 19.5 $24,006 <br />041 -Replace Topsoil from Stockpile D to Pit scraped 4 17.3 $21,369 <br />042 -Replace Topsoil from Stockpile E to Pit scraper1 4 41.9 $51, 651 <br />043 -Replace Topsoil from Stockpile F to Pit scraped 4 68.7 $84,535 <br />044 -Replace Topsail from Stockpile G to Pit scraped 4 39.7 $48,902 <br />045 -Replace Topsoil from Stockpile H to Pit scraped 4 63.6 $78,346 <br />046 -Replace Topsoil from Stockpile 1 to Pit scraped 4 79.3 $97,585 <br />047 -Replace Topsoil from Stockpile K to Pit scraped 4 154.7 $190,359 <br />048 -Replace Topsoil from Stockpile L to Pit scraped 4 83.0 $102,183 <br />049 -Replace Topsoil from Stockpile M to Pit scraped 4 60.4 $74,343 <br />050 -Replace Topsoil from Stockpile O to Pit scraped 4 143.6 $176,713 <br />• <br />051 -Replace Topsoil from Stockpile P to Pit scraped 4 5.8 $7,228 <br />052 -Replace Topsoil from Stockpile O to Pit scraped 4 122.2 $150,385 <br />053 -Replace Topsoil from Stockpile R to Pit scraped 4 102.71 $126,334 <br />054 -Replace Topsoil from Stockpile to MR-17 Drill Pads dozer 2 0.6 $418 <br />055 -Replace Topsoil from Stockpile to MR-17 Access Road to Drill Pad #2 dozer 2 0.2 $159 <br />056 -Replace Topsoil from Stockpile to Access Road to Pond 010 dozer 2 0.2 $157 <br />057 -Replace Topsoil from Stockpile M to Additional TR-25 Disturbance scraped 4 14.2 $17,512 <br />~~ <br />Site : Yoast Mine <br />State :Colorado <br />County : Routt <br />SUBTOTALS : 1,058.7 $1,301,658 <br />
The URL can be used to link to this page
Your browser does not support the video tag.