Laserfiche WebLink
sheet 1 of 2 <br />• <br />Task # <br />Date <br />User <br />CIRCES Cost Estimating Software <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />043 State :Colorado Permitlob # : C-1994-082 <br />1 2/0 62 0 0 5 County : Routt Abbreviation ;none <br />JRS Site : Yoast Mrne Filename : C082-043 <br />Permit or otherjob action :Permit Renewa102 <br />Task description :Replace Topsoil from Stockpile F to Pit <br />HOURLY EQUIPMENT COST <br />Shift basis": 1 perday <br />• Cost Bn <br />Scraper work team Scraper :Cat 637G w/push-pull <br />-Push dozer:NA <br />Support equipment -Load area :LA <br />-Dump area :~NA <br />Road maintenance -Motor grader :ICAT 14H <br />-Water truck :Water Tanker, 5,000 Gal. <br />~aktlown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />load area Dump area Road Maintenance Equipment <br />Gratler Water truck <br />Import data filename : scrape2 NA NA NA grader misctmk <br />Utilization-machine : 100 NA NA NA 25 25 <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownerhip cost/hour : $76.44 NA NA NA $34.94 $22.35 <br />OperatingcosUhour: $166.38 NA NA NA $10.59 $9.17 <br />Ripper op. cost/hour : NA NA NA NA $0.00 NA <br />Operator cost/hour : $32.15 NA NA NA $31.97 $21.16 <br />Unit subtotals : $274.97 NA NA NA $77.50 $52.68 <br />Number of units : 4 0 0 0 1 1 <br />Group subtotals : Work : $1,099.87 Support : 50.00 Maintenance : $130.18 <br />Total work team cosUhour : $1,230.06 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 95,850 LCY factor: NA volume: 95,850 LCY <br />• Source of quantity take-off : Yoast 2001 Annual Reclamation Report -Table 01.1; Map 12-1A <br />Source of estimated swell factor : NA <br />