Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimatintt Software <br />• <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />042 State :Colorado Permit/job # : C-1994-082 <br />12/06/2005 <br />JRS <br />County : Routt <br />Site :Yoast Mine <br />Abbreviation :none <br />Filename : C082-042 <br />Permit or Other job action :Permit Renewal 02 <br />Task description :Replace Topsoil from Stockpile E to Pit <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />• Cost BrE <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 69,691 LCY factor : NA volume : 69,691 LCY <br />Total work team cosUhour: $1,230.06 <br />• <br />Scraper work team -Scraper :Cat 637G w/push pull <br />-Push dozer:NA <br />Support equipment -Load area <br />area <br />Road maintenance -Motor grader :ICAT 14H <br />-Water truck :WaterTanker, 5,000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape2 NA NA NA grader misctruk <br />Utilization-machine : 100 NA NA NA 25 25 <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownerhip cosUhour : $76.44 NA NA NA $34.94 $22.35 <br />OperatingcosUhour: $166.38 NA NA NA $10.59 $9.17 <br />Ripper op. cost/hour : NA NA NA NA $0.00 NA <br />Operator cost/hour : $32.15 NA NA NA $31.97 $21.16 <br />Unit subtotals : $274.97 NA NA NA $77.50 $52.68 <br />Number of units : 4 0 0 0 1 1 <br />Group subtotals : Work : $1,099.87 Support : $0.00 Maintenance : $130.18 <br />Source of quantity take-off : Yoast 2001 Annual Reclamation Report -Table 01.1; Map 12-1A <br />Source of estimated swell factor :NA <br />