Laserfiche WebLink
sheet 1 of 2 <br /> <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />CIRCES Cost Estimating Software <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />041 State :Colorado Permitfjob # : C-1994-082 <br />12/06/2005 <br />JRS <br />Abbreviation :none <br />Filename : C082-041 <br />Permit or otherjob action :Permit Renewal 02 <br />Task description :Replace Topsoil from Stockpile D to Pit <br />County : Routt <br />Site : Yoast Mine <br />= _, , <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />• Cost Bre <br />Description <br />Scraper work team -Scraper :Cat 637G w/push-pull <br />-Push dozer:NA <br />Support equipment -Load area : NA <br />-Dump area 'NA <br />Road maintenance -Motor grader :CAT 14H <br />-Water truck :Water Tanker, 5, 000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape2 NA NA NA grader misctmk <br />Utilization-machine : 100 NA NA NA 25 25 <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownerhip wst/hour : $76.44 NA NA NA $34.94 $22.35 <br />OperatingcesVhour: $166.38 NA NA NA $10.59 $9.17 <br />Ripper op.cosVhour: NA NA NA NA $0.00 NA <br />OperatorcosVhour: $32.15 NA NA NA $31.97 $21.16 <br />Unit subtotals : $274.97 NA NA NA $77.50 $52.68 <br />Number of units : 4 0 0 0 1 1 <br />Group subtotals : Work : $1,099.87 Support : $0.00 Maintenance : $130.18 <br />Total work team cost/hour : $1,230.06 <br />MATERIAL QUANTITIES ~~ <br />Initial Swell Loose <br />volume : 34,943 LCY factor : NA <br /> <br />Source of quantity take-off : Yoast 2001 Annual Reclamation <br />Source of estimated swell factor : NA <br />volume : 34,943 LCY <br />Tahle 01.1; Map 12-fA <br />