Laserfiche WebLink
sheet 1 of 2 <br />• <br />CIRCES Cost Estimating Software <br />Task # <br />Date <br />User <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />039 State :Colorado Permitlob # : C-1994082 <br />12/06/2005 County :Routt Abbreviation :none <br />JRS Siie :toast Mine Filename : C082-039 <br />Permit or other job action ;Permit Renewal 02 <br />Task description :Replace Topsoil from Stockpile B to Shop Area <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />• <br />Cost Bre <br />Scraper work team -Scraper :Cat 637G w/push-pull <br />-Push dozer:NA <br />Support equipment -Load area ~ A <br />-Dump area : NA <br />Road maintenance -Motor grader :CAT 14H <br />-Water truck :Water Tanker, 5,000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape2 NA NA NA grader misctruk <br />Utilization-machine : 100 NA NA NA 25 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cosUhour : $76.44 NA NA NA $34.94 $22.35 <br />Operating cost/hour : $166.38 NA NA NA $10.59 $9.17 <br />Ripper op.cosUhour: NA NA NA NA $0.00 NA <br />Operator cosUhour : $32.15 NA NA NA $31.97 $21.16 <br />Unit subtotals : $274.97 NA NA NA $77.50 $52.68 <br />Number of units : 4 0 0 0 1 1 <br />Group subtotals : Work : $i, 099.87 Support : $0.00 Maintenance : $730.18 <br />Total work team costmour : $1,230.06 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 25,378 LCY factor : NA <br />volume : 25,378 LCY <br />• Source of quantity take-off :toast 2001 Annual Reclamation Report -Table 01.1; Map 12-1A <br />Source of estimated swell factor :NA <br />