Laserfiche WebLink
sheetl oft <br />CiRCES Cost Estimating Software <br />u <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />038 State :Colorado Pennitlob # : C-1994-082 <br />12/06/2005 <br />JRS <br />Permit or other job action :Permit Renewa102 <br />Task description :Replace Topsoil from Stockpile A to Pond 010 <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />• Cost Bre <br />Abbreviation :none <br />Filename : C082-038 <br />Scraper work team -Scraper :Cat 637G w/push-pull <br />-Push dozer :~NA <br />Support equipment -Load area :NA <br />-Dump area :NA <br />County : Roud <br />Site : Yoast Mine <br />Road maintenance -Motor grader :CAT 14H <br />-Water truck :Water Tanker, 5, 000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Loatl area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape2 NA NA NA grader misctruk <br />Utilization-machine : 100 NA NA NA 25 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />OwnerhipwsUhour: $76.44 NA NA NA $34.94 $22.35 <br />OperatingcosUhour: $166.38 NA NA NA $10.59 $9.17 <br />Ripper op.cosUhour: NA NA NA NA $0.00 NA <br />Operator cosUhour : $32.15 NA NA NA $31.97 $21.16 <br />Unit subtotals : $274.97 NA NA NA $77.50 $52.68 <br />Number of units : 4 0 0 0 1 1 <br />Group subtotals : Work : $1,099.87 Support : $0.00 Maintenance : $130.18 <br />Total work team cosUhour : $1,230.Oti <br />C <br /><: <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 45,485 LCY factor: NA volume: 45,485 LCY <br />Source of quantity take-off : Yoast 2001 Annual Reclamation Report -. Tahle 01.1; Map 12-1A <br />Source of estimated swell factor : NA <br />