Laserfiche WebLink
SECTION II - REVISIONS TO THE PERMIT <br />The following is a summary of revisions to the permit since the PR6 proposed decision dated January 6, <br />2012. Since the PR6 decision was issued, there has been a decrease in bond amount required from <br />$6,743,430.00 to the current liability amount of $6,255,552.61. As stated in Section VI, the current bond <br />amount held is more than the required liability amount calculated by the Division ($5,818,456.00). <br />No. <br />Subject <br />Decision /Date <br />Bond <br />Adjustment <br />TR76 <br />Identification of areas of instability within the permit boundary and <br />Approve, <br />No <br />documentation of partial reclamation of light use road LU -2. <br />1/23/2012 <br />TR78 <br />Revised sediment pond inspection schedule. <br />Withdrawn, <br />No <br />7/6/2012 <br />MR71 <br />Rock mulch application in Pond 016 slide area. <br />Approve, <br />No <br />9/5/2012 <br />MR72 <br />Expands the remediation activities to stabilize the pit ramp slide. <br />Approve, <br />No <br />10/19/2012 <br />MR73 <br />Shrub and tree planting list update. <br />Approve, <br />No <br />10/24/2012 <br />MR74 <br />Provides a change in the location of the public copy of the permit documents. <br />Approve, <br />No <br />2/14/2013 <br />TR79 <br />Remediation activities at the Pond 016A slide. <br />Approve, <br />No <br />2/25/2013 <br />TR77 <br />Demonstrations for Permanent Retention of Sedimentation Ponds and <br />Approve, <br />No <br />Stockponds. <br />4/8/2013 <br />SECTION III - STATUS OF STIPULATIONS <br />Two stipulations are attached to this permit. Stipulation 32 was attached to the TR -42 proposed decision <br />issued October 14, 2003. Stipulation 39 was attached to the TR77 proposed decision issued on April 30. <br />2013. <br />Stipulation 32: <br />"For permanent road retention on reclaimed lands, the permittee will submit, within a complete <br />revision application, demonstrations of compliance with 4.03.1(1)(f) or 4.03.2(1)(g) as applicable. <br />The demonstration will include copies of signed landowner requests for road retention from each <br />affected landowner. All road or segments of roads requested for retention will be identified <br />consistent with designation in the permit application (Haul Road G, Ridgeline Access Road, Oil Well <br />Access Road, Etc.). The Road retention demonstrations will be submitted to and approved by the <br />Division prior to approval of Phase 1 Bond Release for any Reclamation Parcel that includes a road <br />or road segment to be retained for the post mining land use." <br />This stipulation has been complied with. Attachment 20 -2 contains justification for the retention of <br />the permanent roads and Appendix 20 -2.1 contains Surface Owner Requests to retain Permanent <br />Features and Structures which include the permanent roads. The remaining permanent roads at the <br />mine site are currently under review for Phase I bond release and the required documentation for <br />