My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-25_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2013-06-25_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:21:43 PM
Creation date
6/26/2013 10:00:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
REVISION
Doc Date
6/25/2013
Doc Name
Preliminary Adequacy Review #2 Response
From
Greg Lewicki & Associates, PLLC
To
DRMS
Type & Sequence
MR86
Email Name
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�/� G��eg Lewicki And Ass ®dates, PLLC <br />11`41 Vv'arrinoon Court Phone: (3113) 3-16 -.5 196 Fax (303 )-346 -6934 <br />Parl.cr, CO USA 80138 I'- tilail: infoa Icw icl.i.bii <br />June 24, 2013 <br />REc��V ED <br />Marcia Talvitie ZQ13 <br />Colorado Division of Reclamation, Mining, and Safety SUN 2 <br />1313 Sherman St, Rm 215 R�Dp,T1pN <br />Denver, CO 80203 pN1M,� AND SAFE�`r <br />Re: New Horizon Mine — Permit No. C- 1981 -008 , <br />Minor Revision No. 86 (MR -86) — Vegetation Sampling and Pasture Management <br />Preliminary Adequacy Review #2 Response <br />Dear Ms. Talvitie <br />Western Fuels- Colorado (WFC) received additional comments from the Division of <br />Reclamation, Mining, and Safety regarding the revision of management and vegetation sampling <br />details in the New Horizon Mine permit. WFC's responses to the new comments are shown <br />below <br />Item 2: <br />The language on page 27 of Section 2.05.4(2)(e) has been clarified to address the Division's <br />concerns: <br />• Instead of "If production sampling is done along the same transect tape, then a minimum of at <br />three predetermined randomly selected intervals will be used as the production sampling points. " <br />It now says, "When production sampling is done along the same transect tape, then a minimum <br />of at least one, but possibly three, predetermined randomly selected intervals will be used as the <br />production sampling points. " (Changes emphasized) <br />The number of transects (minimum of one, but possibly three) matches the Proposed 2013 Phase II and III <br />Revegtation Monitoring Plan. <br />• The sentence, "Production will be calculated by dividing dry weight by the quadrat frame area in <br />acres, and the mean dry weight per acre calculated. " has been removed <br />The formatting of the revised pages is designed to line them up with the initial MR submittal. <br />This should facilitate incorporating the complete 12 page revision into the existing approved <br />permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.