Laserfiche WebLink
Page 4 of 5 <br />13. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO r NA <br />If "NO" please explain: <br />14, If exploration has exposed groundwater, is the site in compliance with the approved mining plan and Office ofAUe-_ <br />State Engineer (Well Permit, S.W.&P., andior Permanent Augmentation Plan)? YES NO <br />15. Are all hazardous materials stored within approved spill containment structures? YES NO N/A <br />16. Does your N01 reclamation plan or Enviromnental Protection Plan require you to submit monitoring infortnatI!,g)p <br />annually? YES NO (' N fA <br />If -Yes ", please attach the required monitoring results to this Annual Report as required by Rule I . I 5(l)(c). <br />17. As required by Rule 5.6(1)(g) submit with this report documentation to show that the Financial Warranty is still in <br />place and is adequate to fully reclaim the approved prospecting site disturbance(s). <br />FINANCIAL WARRANTY DOCUMENTATION Arl'ACHED v— <br />18. Please use the space below to describe as required by Rule 5.6(1)(c) any new prospecting activity that occurred during <br />the preceding year, including the locations and number of new surface drip holes, mud pits, excavations, rock dumps, <br />adits, shafts, trenches, pits, roads and structures. If applicable, you must also describe the measures taken to safeguard <br />shafts, adits and other mine openings from unauthorized entry both during and after prospecting. Additional pages <br />Q6— M 6 gtl if na,Ae A <br />C.-W "J "0-4— /31 <br />at- C- <br />