Laserfiche WebLink
6/21/13 State.co.us Eecutive Branch Mail -Re: FW: engineering specifications for stream crossings, Sunset a )ploration <br />Sent: Thursday, June 20, 2013 11:08 AM <br />To: Welt, Kathy <br />Subject: engineering specifications for stream crossings, Sunset exploration <br />Hi Kathy, <br />Per our discussions, because of individual site specific conditions such as soil conditions and moisture <br />content, water depth /flow rates of streams, approach grades, etc., the USFS cannot recommend a "one -size- <br />fits -all" design for stream crossing within the Sunset Exploration area. <br />In order to better field fit each individual stream crossing the FS will direct MCC construction methodologies at <br />each site, and make the determination on whether or not to install a culvert, a hardened surface ford, or other <br />specifications at the time of construction. <br />If you have any questions or concerns please contact me. <br />Regards, <br />Ryan <br />This electronic message contains information generated by the USDA solely for the intended recipients. <br />Any unauthorized interception of this message or the use or disclosure of the information it contains may <br />violate the law and subject the violator to civil or criminal penalties. If you believe you have received this <br />message in error, please notify the sender and delete the email immediately. <br />** *Email Disclaimer: The information contained in this e -mail, and in any accompanying documents, may <br />constitute confidential and /or legally privileged information. The information is intended only for use by the <br />designated recipient. If you are not the intended recipient (or responsible for deliery of the message to the <br />https: / /mai l.g oog le.conVmai 1 /u /0 / ?ui =2 &i Ire29129fcb5 &\iev�-- pt &search =i nboy&th= 13f6388d4bbd7986 2/3 <br />