Laserfiche WebLink
­VD <br />112c Annual Report <br />JUN 0 7 2013 <br />DMSION OF RECLAMATION <br />A 11\11 \V+ ALM ^­1 <br />Page 2 of 3 <br />Permittee Name: <br />Eastern Colorado <br />A re ates, LLLP <br />Permit Number: <br />M-2006-013 WWr- 1 T <br />Operation Name: <br />Potts Pit #2 <br />County: <br />Huerfano <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />June 21, 2013 <br />Permit Acreage: <br />49.00 <br />Current Bond Amt: <br />$64,836.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />CD NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />YES NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />Total acres <br />mulched w/ <br />approved mulch: <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />Total acres <br />graded: <br />5. Does the mine operate more than 180 days per year? <br />YES NO <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />Topsoil <br />replacement <br />depth (in.): <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />YES <br />b) approval for INTERMITTENT OPERATION? <br />YES N <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />Fertilizer <br />8. Number of acres that were newly affected during the current report year._ <br />Mulch <br />9. Number of acres that were reclaimed during the current report year. <br />application <br />method: <br />10. Estimated new acreage to be affected in the next report year. <br />application <br />method: <br />11. Estimated acres to be reclaimed in the next report year. <br />application <br />method: <br />12. Total acres in various stages of reclamation, since permitted mining activities be an: <br />Total acres <br />backfilled: <br />32- <br />Total acres <br />seeded w/ <br />approved mix: <br />3 <br />Total acres <br />w /topsoil <br />replaced: <br />3z <br />Total acres <br />mulched w/ <br />approved mulch: <br />.� . <br />Total acres <br />graded: <br />2 <br />J <br />Total acres <br />fertilized w/ <br />apvd fertilizer: <br />Topsoil <br />replacement <br />depth (in.): <br />r <br />- <br />Mulch application <br />rate (tons /ac): <br />Seed <br />Fertilizer <br />Mulch <br />application <br />method: <br />(-I ' <br />application <br />method: <br />N N -C- <br />application <br />method: <br />N L° <br />