My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-10_REVISION - M1995038
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1995038
>
2013-06-10_REVISION - M1995038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 7:13:04 PM
Creation date
6/18/2013 3:48:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995038
IBM Index Class Name
REVISION
Doc Date
6/10/2013
Doc Name
SI-02 INCREASE
From
DRMS
To
OPERATOR
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Spread Topsoil on all Graded Areas <br />Site: Spor Pit Permit Action: 2013 Inspection Permit/Job #: M1995038 <br />PROJECT IDENTIFICATION <br />Task #: 004 State: Colorado <br />Date: 6/6/2013 County: San Miguel <br />User: KAP <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Cat D9T - 9SU <br />405 <br />Semi - Universal <br />3 -shank ripper <br />1 per day <br />(CRG) <br />Abbreviation: None <br />Filename: M038 -004 <br />Total unit Cost/Hour: $257.87 <br />Total Fleet Cost/Hour: <br />$257.87 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,000 <br />Swell factor: 1.000 <br />Loose volume: 2,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />150 feet <br />910.5 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />10% <br />7,350 feet <br />2,5501bs /LCY <br />Weight description: Earth - Dry <br />packed <br />Utilization % <br />Ownership Cost/Hour: <br />$78.33 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $257.87 <br />Total Fleet Cost/Hour: <br />$257.87 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,000 <br />Swell factor: 1.000 <br />Loose volume: 2,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />150 feet <br />910.5 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />10% <br />7,350 feet <br />2,5501bs /LCY <br />Weight description: Earth - Dry <br />packed <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />(AVG.) <br />Material consistency: <br />1.100 <br />CAT HB <br />Dozing method: <br />1.000 <br />GEN. <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.