My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-10_REVISION - M1995038
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1995038
>
2013-06-10_REVISION - M1995038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 7:13:04 PM
Creation date
6/18/2013 3:48:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995038
IBM Index Class Name
REVISION
Doc Date
6/10/2013
Doc Name
SI-02 INCREASE
From
DRMS
To
OPERATOR
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task # 001 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG. <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(SSD -AC) <br />0.786 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.697 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.2455 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIlAE AND COST <br />459.58 LCY/hr <br />459.58 LCY/hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.578/LCY <br />Total job time: <br />Total job cost: <br />12.10 Hours <br />$3,216.81 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.