My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-10_REVISION - M1995038
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1995038
>
2013-06-10_REVISION - M1995038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 7:13:04 PM
Creation date
6/18/2013 3:48:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995038
IBM Index Class Name
REVISION
Doc Date
6/10/2013
Doc Name
SI-02 INCREASE
From
DRMS
To
OPERATOR
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: 2013 Inspection <br />Site: Spor Pit <br />COST SUMMARY WORK <br />Permit Action: 2013 Inspection Permit/Job #: M1995038 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 6/6/2013 County: San Miguel <br />User: KAP <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: M038 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />Reduce Hi walls to 3:1 <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />12.10 <br />$3,216.81 <br />$1,110.13 <br />$1,408.00 <br />$1,458.38 <br />$5,535.24 <br />$2,289.13 <br />Spread Overburden on Slopes and Floor <br />DOZER <br />4.30 <br />Rip Compaction on Pit Floor <br />RIPPER <br />5.26 <br />Spread Topsoil on all Graded Areas <br />DOZER <br />5.66 <br />Reve etate <br />REVEGE <br />8.00 <br />Mobilize <br />MOBILIZE <br />4.50 <br />SUBTOTALS: <br />39.82 <br />$15,017.69 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />0.00% <br />Total = <br />$0.00 <br />0.00% <br />Total = <br />$0.00 <br />19.91 hrs <br />Total = <br />$1,302.31 <br />10.00% <br />Total = <br />$1,501.77 <br />TOTAL O & P = <br />$2,804.08 <br />CONTRACT AMOUNT (direct + O & P) = <br />$17,821.77 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and/or administration: <br />500.00 <br />10.00% <br />7.10% <br />CONTINGENCY: 0.00 <br />Total = 500.00 <br />Total = $1,782.18 <br />$1,265.35 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $6,351.60 <br />TOTAL BOND AMOUNT (direct + indirect) = $21,369.29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.