My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-10_REVISION - M1995038
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1995038
>
2013-06-10_REVISION - M1995038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 7:13:04 PM
Creation date
6/18/2013 3:48:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995038
IBM Index Class Name
REVISION
Doc Date
6/10/2013
Doc Name
SI-02 INCREASE
From
DRMS
To
OPERATOR
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mobilization Worksheet Cont'd Task # 006 Page 2 of 2 <br />EOUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />NUCLA <br />Total one -way travel distance: <br />25.00 miles <br />Average Travel Speed: <br />40.00 mph <br />Total Non - Roadable Mob/Demob Cost <br />NA <br />`* two round trips with haul rig: <br />$2,241.18 <br />Total Roadable Mob/Demob Cost * * <br />1.25 <br />* * one round trip, no haul rig: <br />$47.95 <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.63 <br />0.63 <br />0.63 <br />0.63 <br />0.50 <br />NA <br />0.50 <br />NA <br />2.25 <br />1.25 <br />Total job time: 4.50 Hours <br />Total job cost: $2,289.13 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.