Laserfiche WebLink
Reveg Worksheet Cont'd Task # 005 Page 2 of 2 <br />Total Seed Application Cost /Acre $88.20 <br />MULCHING and NHSCELLANEOUS <br />Materials <br />Application <br />Description <br />Units / <br />Crimping, with tractor {DMG survey data <br />$65.89 <br />Power mulcher (MEANS 32 91 13.16 0250) <br />Description <br />Acre <br />Unit <br />Cost / Unit <br />Cost /Acre <br />Straw, delivered MEANS 3125 14.16 1200 <br />2.00 <br />TON <br />$265.00 <br />$530.00 <br />Total Mulch Materials Cost/Acre <br />$530.00 <br />Application <br />Description <br />Cost /Acre <br />Crimping, with tractor {DMG survey data <br />$65.89 <br />Power mulcher (MEANS 32 91 13.16 0250) <br />$86.68 <br />Total Mulch Application Cost/Acre <br />$152.57 <br />NURSERY STOCK PLANTING <br />Common Name <br />No / <br />Acre <br />Type and Size <br />Planting <br />Cost <br />Fertilizer <br />Pellet Cost <br />Cost /Acre <br />Totals Nursery Stock Cost / Acre <br />1 $0.00 <br />JOB TEWE AND COST <br />No. of Acres: <br />Estimated Failure Rate: <br />*Selected Replanting Work Items: <br />Initial Job Cost: <br />Reseeding Job Cost: <br />Total Job Cost: <br />Job Hours: <br />$4,612.70 <br />$922.54 <br />$5,535.24 <br />8.00 <br />5 Cost /Acre: <br />20% Cost /Acre *: <br />TILLING, SEEDING,MULCHING <br />$922.54 <br />$922.54 <br />CIRCES Cost Estimating Software <br />