Laserfiche WebLink
Technical Revision Statement: <br />Changing our mining plan from dredging, to using a dry shaker for producing <br />materials. Because of our current water situation we don't want to expose any more <br />water than the creek dose all ready, so we have decided to eliminate the lake. We <br />plan to take and lowering the present dam five feet, using that material to fill low <br />lying areas. This will allow us to increase the size of the camp ground, to an <br />additional 2S tent camp sites. We will make and use the materials (black dirt, road <br />base, and sand) from materials on site, and haul any extra away. To stop the erosion <br />problem we plan on building a 3 foot high concrete waterfall, that's on the west end <br />of the property. The creek will meander thru the old lake bed. Where we can still <br />have stream fishing for our camps. We plan to install logs and rocks along the shore <br />lines for fish habit and erosion. On the map we show where the roads are, parking <br />lots, building, creek, and where the camp sites will be. <br />