My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-13_REPORT - M1987078
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1987078
>
2013-06-13_REPORT - M1987078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 3:49:30 PM
Creation date
6/14/2013 7:16:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987078
IBM Index Class Name
REPORT
Doc Date
6/13/2013
From
City of Lamar
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LAMAR INDUSTRIAL PARK <br />GRA VEL PIT <br />PERMIT # M -1987 -078 <br />File Name: H: \DRAWING FILES \ENGINEERING \TOPO \Gravel Pit LIP \Grpitlip.dwg <br />_ 1914.72 FT <br />zz r HAUL— — –GOAD— — — — —N 89 28'00" W — — — — <br />O N �w <br />NCO <br />7.649 ACRES GRAVEL PIT aF ANC REa EO W O <br />0 0 3.004 ACRES tits 0 <br />O <br />S 819'28'00" E <br />1436.41 FT <br />LAMAR INDUSTRIAL PARK GRAVEL PIT PRIOR YEAR <br />NOTIFICATION <br />Disturbances to existing land are shown on this map for the year <br />2012 -2013. <br />Reclamation on the East 2.284 Acres accomplished to date at the <br />site. Released from reclamation responsibility, May, 2001. <br />Land in the process of being reclaimed is designated on the map. <br />This area will not be utilized for future mining operations. <br />Only 1.OAc new disturbances are expected to occur during the <br />o upcoming year and include only utilizing existing stockpiled <br />o material, where shown on this map. Should new mining occur <br />M I in 2012 -2013, it will be minimal, to extract 120 tons. <br />0 <br />0 <br />Z Active operations began November Ist 2012. <br />Active operations still on going in 2013. <br />Approximately 100 tons of material were utilized from <br />excavated and stockpiled material in the Active operations <br />800.00' referenced mining months. <br />31 1 32 S 89.36'00° E LAMAR <br />SCALE 1"= 250' <br />Updated May 2013 <br />INDUSTRIAL PARK <br />S 89'2_8'00" E <br />- <br />~ 478.31 FT <br />_ <br />c <br />2.264 ACRES . AR-1 ED <br />R".Mlon No. AR -1 <br />.b' b. <br />/O. <br />ry " <br />2 <br />S 89'28'00" E <br />—S <br />379.36 FT <br />
The URL can be used to link to this page
Your browser does not support the video tag.